MD-FF-200/1300e Molecular Vacuum Pump by Grease Lubrication

Oil or Not: Oil Free
Structure: Rotary Vacuum Pump
Exhauster Method: Positive Displacement Pump
Vacuum Degree: High Vacuum
Work Function: Mainsuction Pump
Working Conditions: Dry

Contact Supplier

Diamond Member Since 2017

Suppliers with verified business licenses

Basic Info.

Model NO.
MD-FF-200/1300E
Transport Package
Special Package
Specification
10kg
Trademark
KYKY/minderhightech
Origin
Beijing
HS Code
8414100090
Production Capacity
50000PCS/Year

Product Description

MD-FF-200/1300E Molecular vacuum pump by grease lubrication

Molecular  Vacuum Pump MD-FF-200/1300E, grease lubracation, widely used in scientific research, aerospace, solar cell, coating, lighting, semi-conductor, etc

MD-FF-200/1300e Molecular Vacuum Pump by Grease LubricationMD-FF-200/1300e Molecular Vacuum Pump by Grease LubricationMD-FF-200/1300e Molecular Vacuum Pump by Grease LubricationMD-FF-200/1300e Molecular Vacuum Pump by Grease Lubrication

-----------------------------------------------------------------------------------------------------------
we,as the leading vacuum product in china, provide full range of vacuum pumps, including:

1,Molecule turbo pump.

2,Ion pump.

3,Rotary-vane pump.

4,Turbo pump station.

5,Turbo pump and Ion pump controller.

6,and Helium leak tester.
-----------------------------------------------------------------------------------------------

guangzhou minder-hightech co.,ltd
contact:shunyu.hu  
 
 


Q: How to buy your products ?
A: We have some products in stock , you can take away the products after you arrange the payment ; If we don't have the products in stock you want, we will start production once getting the payment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The price will be adjusted appropriately as the
price fluctuation of raw material in the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about one week to finish the production.


 

Send your message to this supplier

*From:
*To:
avatar Mr. Minder Hu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now